Loging...

KPDC, Korea Polar Data Center

Korea Polar Data Center Scientific observations and results from Antarctica shall
be exchanged and made freely available

Climate Measurement Around the King Sejong Station, Antarctica in 2024

Meteorological observation has been carried out at the King Sejong Station in 2024. Observational elements are composed of wind, air temperature, relative humidity, station level atmospheric pressure, and precipitation. Goals of this observation are 1) to understand meteorological phenomena and 2) to monitor climate change at Antarctic Peninsula. These data are recorded automatically then examined by meteorological expert at the station to be produced as a daily, monthly, and annual report. To understand weather phenomena and to monitor climate variability at Antarctic Peninsula

Register faveorites
Disclosure Request

87Views

Entry ID
DOI
https://dx.doi.org/doi:10.22663/KOPRI-KPDC-00002567
Copyright
Science Keyword
ISO Topic
Climatology/Meteorology/Atmosphere
Related URL
Climate Measurement Around the King Sejong Station, Antarctica in 2021
Climate Measurement Around the King Sejong Station, Antarctica in 2022
Climate Measurement Around the King Sejong Station, Antarctica in 2023
Platforms
WEATHER STATIONS
Instruments
BAROMETERS
TEMPERATURE SENSORS
HUMIDITY SENSORS
WIND VANES
Personnel
  • Sang-jong Park (sangjong@kopri.re.kr)
  • Tae Jin Choi (ctjin@kopri.re.kr)
  • Eui-Seok Chung (echung@kopri.re.kr)
Project
Research period
2024-01-01 ~ 2024-12-31
Create/Update Date
2024-10-10 / 2024-10-10
Location
King Sejong Station > King George Islands > Antarctic Peninsula
Citation
The data(KOPRI-KPDC-00002567) used in this work was provided by the Korea Polar Research Institute.
Spatial Coverage

POINT

  • lat:-62.220000, lon:-58.780000

My Favorite Areas

Favorite Area
EPSG Title Lat Lon ZoomLv DEL

Measure

distance

Unit Selection

Area

Unit Selection

Raw Data
File Size 5.53 Mb for 1 item
Category File Name Description Size Status
Rawdata KSJ_Meteo_2024Jan_Aug.dat 10-minute interval AWS data of the King Sejong Station in 2024. Full 12-month data will be uploaded by April 2025 after quality check. 5.53 Mb Request required